⚠️ Connection Lost. Displayed data may be outdated. Waiting for network...
👤
My Profile
Soundbox User • Loading email...

Update Access PIN

Your PIN is used to sign in to all Soundbox Logistics dashboards.

Automated Email Subscriptions

Choose which automated reports and alerts you receive. Only alerts related to your active permissions are available.

Loading your subscription settings...

Customize Top Navigation Bar

Checked pages stay pinned directly on your top bar. Unchecked pages will be tucked into the More ▾ menu.

💡Tip: Pinning 4 to 6 items keeps your bar neat and prevents overcrowding on smaller screens.

Secure Login

Enter your PIN to access this dashboard.

Keep me logged in
📱 Launch Mobile Field App
📱 Mobile App
Satellite Par Mode: Calibrating on-site storage & empirical truck trip savings
Show Days (2026–2027)
265
Active dates across both venues
Target Par Level
0
Total equipment target at 85% coverage
Current On-Site (DT)
0
Cataloged in Downtown Warehouse
Net On-Site Gap
0
Units needed on site to reach target par
Est. Shuttles Avoided ROI Details
68
Out of 134 confirmed runs (~$46,920 saved)
Cost / Run:
$
CapEx Deficits
0
True purchases (fleet < par)

Downtown Complex Daily Demand Profile

Single-Day Concurrency Roll-Up

Statistical breakdown of combined gear volume deployed simultaneously across all concurrent downtown jobs on any single active calendar day (2026–2027 show calendar).

Inventory Safeguard: Path A Shortage Protection Active
Typical Show Day (P50) Median
413 units / day
130 unique catalog models • 2 concurrent quotes
80% of Days (P80 Benchmark) Par Target Boundary
1,191 units / day
217 unique catalog models • 4 concurrent quotes
Routine Baseline (Typical 80%) Trimmed
257 units / day
Middle day volume excluding top 20% convention spikes
Peak Event Spike (100% Outlier) Project Truck
4,960 units
601 models • Oct 9 (Folk Canada / AFN Climate)
Daily Combined Demand Curve (Click to test coverage tier):
P10: 30 units (13 SKUs) P25: 100 units (24 SKUs) P50: 413 units (130 SKUs) P75: 987 units (210 SKUs) P80: 1,191 units (217 SKUs) P85: 1,375 units (241 SKUs) P90: 1,871 units (281 SKUs) P95: 2,206 units (328 SKUs) Peak: 4,960 units

Coverage Percentile Model 85th Percentile

At 85% coverage, on-site inventory satisfies 100% of equipment demand for 85% of active event-days. The top 15% peak demand days are treated as exceptions requiring shuttles from the main warehouse.

70% (Baseline) 75% 80% 85% (Recommended) 90% 95% 100% (Raw Peak)

Main Shop Show Exclusion Filter 50% (Recommended)

Shows where ≥ 50% of gear comes from the Main Shop ride along on the shop truck. Their items do not inflate downtown on-site par storage.

30% (Lean) 40% 50% (Rec.) 60% 70% 100% (Off)

Multi-Event Concurrency (2026–2027 Calendar Days)

Shuttle Cost: $ / run
Showing 0 of 0 unique equipment models
Click any row to view demand percentiles, booking breakdown, and top peak-driver events
Equipment Model Department Show Days On-Site (DT) Target Par Net Gap Peak Demand Main Shop Fleet Recommended Action